Scheme to build over 600 kilometres of roads- under a 500 dollar loan scheme from commercial banks under Treasury guarantee
Long term loan: HNB IN FEB : the loan will be repaid over 14.5-years with 2.5-year grace, at the rate of AWPLR +1.5%
COMB Dec 12
18 kilometre road - The road runs from Meepe to Ingiriya
LKR 1,802 million
HNB March :
27 kilometre stretch - Haputale, Boralanda
LKR 2,445 million
HNB FEB
LKR 3.2 billion long-term loan to finance the rebuilding of 37.5 kilometres
Road sections: 33.50 to 44.0 kilometres
57 to 59 kilometres on the Naula - Elahara - Laggala - Pallegama - Hettipola Road (B 312)
Road Sections :20 to 45 kilometre stretch on Hasalaka Handungamuwa Road (B484).
Great for Banks